Villa Finishing Cost Calculator UAE 2026 – Al Ain & Abu Dhabi

Free estimator for ADHA loan recipients, UAE bank loan holders, government grant beneficiaries, villa owners and contractors in Al Ain, Abu Dhabi, Khalifa City, Musaffah, MBZ City, Al Dhafra and all Abu Dhabi Emirate areas. Uses live 2026 UAE material and labour rates.

2026 estimate: AED 350–900+/m² depending on tier. A standard 300 m² villa = AED 120,000–250,000 complete finishing.
TradeEconomyStandardPremium
Floor & Wall Tiles45–70 AED/m²70–120120–200
Marble & Stone150–250250–500
Gypsum Ceilings30–5050–9090–160
Paint15–2525–4545–80
UPVC Windows & Doors40–7070–120120–220
Waterproofing & Insulation20–3535–6060–100
How much does it cost to finish a villa in Abu Dhabi in 2026?

AED 350–900+ per m² in 2026. A standard 300 m² villa costs AED 120,000–250,000 for mid-range finishing (tiles, gypsum, paint, UPVC, labour). Premium with marble can exceed AED 300,000.

Can I use this for my ADHA or bank loan file?

Yes. The itemised breakdown supports ADHA, UAE bank loan, and government grant submissions. For an official stamped BOQ, contact Wehomein for a site survey.

Is Al Ain finishing cheaper than Abu Dhabi city?

Labour in Al Ain is typically 10–20% lower. Material prices are similar. The calculator adjusts by region automatically.

Rates sourced from Wehomein supplier network & Al Mounshed General Contracting data — updated June 2026.